Non-Compliance detail


  
Summary
 
Licence number: 12003
Annual Return Start: 22 Dec 2005
Annual Return End: 21 Dec 2006
Date Received: 19 Feb 2007
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L3 Exceedance of Monitoring Point 1 (compressor #1) emission concentration limits for Sulphur Dioxide and Sulphur Trioxide/Sulphuric Acid mist. Refer letter sent to EPA 23/11/06. EPA has written to licensee regarding non-compliance and relevant action 1
L3 Exceedance of Monitoring Point 4 (reboiler flue) emission concentration limits for Sulphur Trioxide/Sulphuric Acid mist. Refer letter sent to EPA 23/11/06. EPA has written to licensee regarding non-compliance and relevant action 1
L3 Re request from EPA, a relative accuracy test carried out on the CEMS for Compressor #1 at Rosalind Park Gas Plant. Report submitted on 16/6/06 confirmed CEMS operating correctly, however at times the NOx licence limit (Point 1) was exceeded. EPA has written to licensee regarding non-compliance and relevant action 1
L5.4/L5.5 Exceedance of the licenced quantity of Haz and/or Ind and/or Group A waste stored on the premises at any one time, and generated at the premises throughout the reporting year. EPA has written to licensee regarding non-compliance and relevant action 1
M2.1 First quarterly (March 2006) air emissions monitoring was not completed due to unresolved negotiations between previous licensee (Sydney Gas) and EPA. EPA has written to licensee regarding non-compliance and relevant action 1
M2.1 Discharge and monitoring Point 7 main flare not sampled. Refer details previously sent to EPA 19/8/04. EPA has written to licensee regarding non-compliance and relevant action 1
O2.1 Well No RP12 - 3/6/06 - A hydraulic hose ruptured on an electric hydraulic pumping unit, causing 60L of hydraulic oil to spill on the well site pad and access road. Refer letter sent to EPA 5/6/06 EPA has written to licensee regarding non-compliance and relevant action 1